
Cycle Way 9
Between November 2021 and July 2022, we delivered a programme of construction works for the C9 scheme.
These changes, which were made between Goldhawk Road and Chiswick Lane have included:
-
Reinstatement of the left-turn filter lane at the junction of Chiswick Lane and Chiswick High Road.
-
Installation of shelters at bus stops between Chiswick Lane and Heathfield Terrace
-
Introduce lay by pick-up and drop-off points for taxis and other vehicles between Chiswick Lane and Heathfield Terrace
-
Replacement temporary traffic wands with permanent, paved barriers, to make road segregation clearer
-
Changes to side road layouts to make cyclists more visible to vehicles
-
Installation of more signs to make the cycle lanes more visible
-
Additional tactile paving and new paving including pavement levelling
-
Introduction raised tables at side roads



