A1 Archway Gyratory, N19

This project introduced a new public space, a two-way traffic system, dedicated cycle lanes and new pedestrian crossings in the area.

​

The work was part of the plan to improve London's roads.

​

As part of the improvements, we completed:

​

  • Changed the one-way gyratory traffic system to two-way operation

  • Created a new public space

  • Closed the southwest arm of the gyratory outside the Tube station to traffic

  • Permanently reversed the one-way operation of Vorley Road and MacDonald Road

  • Relocated bus stops around the new road layout

  • Built a new two-way cycle route in the public space near Archway Tube station

  • Introduced segregated cycle lanes

  • Installed a new street-level pedestrian crossing on Archway Road (near Despard Road) to replace the pedestrian underpass

​